ROBOTICS / ISAAC SIM

GPU Cloud for NVIDIA Isaac Sim

Plan simulation, synthetic data and robot-learning compute around your Isaac Sim version, renderer and delivery stage. Start with a scoped 7–14 day pilot.

No payment is required to submit a request.

QUICK ANSWER

What buyers need to know

Simulation and robot inference are different workloads. A compatible RTX configuration may be appropriate for rendering, while training and VLA work can require a separate GPU plan, storage budget and acceptance test.

CONFIGURATIONS & PRICING
ConfigurationBest forPricing
RTX PRO / L40SSingle-GPU simulation and scene developmentRequest availability
H100 / H200Robot learning and memory-heavy jobsRequest availability
Multi-GPU pilotParallel simulation or dataset generationPilot quote
Dedicated nodeSustained simulation and trainingReserved quote

Current capacity, complete configuration and total pricing are confirmed before activation.

WORKLOAD FIT

Workload fit

Single-GPU scene testing

Parallel simulation

Synthetic dataset generation

Robot-learning training

Physical AI validation

What will your proposal cover?

  • Workload fit, GPU configuration, count, region and deployment model.
  • Complete USD pricing scope for GPUs, storage, networking and applicable taxes.
  • An agreed scope, duration and acceptance measures if a pilot is needed.

Bring your workload brief

Share the simulator and version, scene or model, sensors and your target metric. Tell us whether you need rendering, robot learning or both so we can assess separate GPU requirements.

English and Chinese assistance · Australia/APAC business-hours support · No charge before quote acceptance · Infrastructure provider disclosed before activation

How it works

One clear path from requirement to a deployable configuration.

  1. Submit requirements

    Tell Arvica the workload, GPU count, region and start date.

  2. Compare deployable options

    Arvica confirms configuration, capacity and complete charges.

  3. Test or deploy

    Run a pilot or proceed under a reserved-capacity agreement.

FAQ

What GPU should I start with for Isaac Sim?

Start with a configuration compatible with your exact Isaac Sim version and renderer; confirm driver and software requirements before quoting.

Is simulation the same as robot inference?

No. Simulated rendering, on-robot inference and training can have different GPU, latency and storage requirements.

How long is a pilot?

A 7–14 day scope is a common planning range; duration, cost and acceptance criteria are agreed before activation.

What storage should I plan?

Separate scene assets, generated data, model weights and checkpoints. Confirm persistence and transfer costs in the quote.

Can I scale after the pilot?

Yes, after reviewing measured memory, simulation throughput and the next deployment requirement.

Buying guides and pilot worksheet

ROBOTICS / ISAAC SIM

Ready to scope your compute?

Share the workload and Arvica will prepare deployable options for review.

Privacy information